    
{"id":43067,"date":"2020-10-27T17:14:48","date_gmt":"2020-10-27T16:14:48","guid":{"rendered":"https:\/\/www.praha7.cz\/?p=43067"},"modified":"2020-10-27T17:16:27","modified_gmt":"2020-10-27T16:16:27","slug":"tsk-hleda-dodavatele-rekonstrukce-libenskeho-soumosti","status":"publish","type":"post","link":"https:\/\/www.praha7.cz\/tsk-hleda-dodavatele-rekonstrukce-libenskeho-soumosti\/","title":{"rendered":"TSK hled\u00e1 dodavatele rekonstrukce Libe\u0148sk\u00e9ho soumost\u00ed"},"content":{"rendered":"<p>[perex]<\/p>\r\n<p>Technick\u00e1 spr\u00e1va komunikaci hl. m. Prahy (TSK) vypsala ve\u0159ejn\u00e9 zak\u00e1zky na rekonstrukci Libe\u0148sk\u00e9ho mostu a&nbsp;na spr\u00e1vce stavby a&nbsp;koordin\u00e1tora cel\u00e9 akce. P\u0159edm\u011btem prvn\u00ed ve\u0159ejn\u00e9 zak\u00e1zky je v\u00fdb\u011br dodavatele stavebn\u00edch prac\u00ed a&nbsp;souvisej\u00edc\u00edch projek\u010dn\u00edch a&nbsp;in\u017een\u00fdrsk\u00fdch \u010dinnost\u00ed. V\u00fdb\u011br prob\u011bhne podle standard\u016f FIDIC \u2013 Yellow book, tedy projekt typu Desing &amp; Build. \u00da\u010delem druh\u00e9 ve\u0159ejn\u00e9 zak\u00e1zky je v\u00fdb\u011br spr\u00e1vce stavby a&nbsp;koordin\u00e1tora cel\u00e9 akce.<br \/>\r\n[\/perex]<\/p>\r\n<p><em>\u201ePostupn\u011b posouv\u00e1me projekt rekonstrukce Libe\u0148sk\u00e9ho mostu, kterou \u0159e\u0161\u00edme komplexn\u011b. Sout\u011b\u017e je vyps\u00e1na i&nbsp;na dal\u0161\u00ed objekty, kter\u00e9 byly d\u0159\u00edve p\u0159ipravov\u00e1ny zvl\u00e1\u0161\u0165 u&nbsp;jin\u00fdch m\u011bstsk\u00fdch organizac\u00ed. N\u00e1m se v\u0161e poda\u0159ilo zkoordinovat a&nbsp;p\u0159ipravit najednou. Je to neuv\u011b\u0159iteln\u00fd p\u0159\u00edb\u011bh, k&nbsp;zemi m\u011bl j\u00edt most, na kter\u00fd se 92 let nes\u00e1hlo, a&nbsp;p\u0159itom zvl\u00e1dl zkou\u0161ky s&nbsp;extr\u00e9mn\u00ed z\u00e1t\u011b\u017e\u00ed 547 tun. Jasn\u011b se tedy uk\u00e1zalo, \u017ee spr\u00e1vnou cestou je rekonstrukce, zat\u011b\u017eovac\u00ed zkou\u0161ky n\u00e1m nav\u00edc daly do ruky velmi podrobn\u00e1 data, d\u00edky kter\u00fdm se vyhneme slep\u00fdm cest\u00e1m,\u201c<\/em> \u0159\u00edk\u00e1 <em><strong>Adam Scheinherr, n\u00e1m\u011bstek prim\u00e1tora<\/strong><\/em>, radn\u00ed pro oblast dopravy a&nbsp;p\u0159edseda dozor\u010d\u00ed rady TSK.<\/p>\r\n<p>C\u00edlem zak\u00e1zky je oprava mostu p\u0159es Vltavu V009 a&nbsp;inunda\u010dn\u00edho mostu X656 na Rohansk\u00e9m ostrov\u011b a&nbsp;kompletn\u00ed vybudov\u00e1n\u00ed v\u0161ech dal\u0161\u00edch mostn\u00edch objekt\u016f, p\u0159ilehl\u00fdch komunikac\u00ed a&nbsp;nutn\u00fdch p\u0159elo\u017eek in\u017een\u00fdrsk\u00fdch s\u00edt\u00ed v&nbsp;ulici Libe\u0148sk\u00fd most od k\u0159i\u017eovatky D\u011blnick\u00e1 \u2013 Jankovcova v&nbsp;Praze 7 ke k\u0159i\u017eovatce Palmovka v&nbsp;Praze 8. Sou\u010d\u00e1st\u00ed rekonstrukce bude kompletn\u00ed v\u00fdm\u011bna trak\u010dn\u00edho veden\u00ed a&nbsp;kolejov\u00e9ho svr\u0161ku pro tramvajovou tra\u0165 v&nbsp;ulici Libe\u0148sk\u00fd most a&nbsp;okol\u00ed. Po\u010d\u00edt\u00e1 se tak\u00e9 se stavbou proplachovac\u00edho kan\u00e1lu a&nbsp;reten\u010dn\u00ed n\u00e1dr\u017ee a&nbsp;souboru protipovod\u0148ov\u00fdch opat\u0159en\u00ed. Celkov\u00e1 p\u0159edpokl\u00e1dan\u00e1 hodnota ve\u0159ejn\u00e9 zak\u00e1zky \u010din\u00ed 2,85 mld. K\u010d.<\/p>\r\n<p><strong>Nab\u00eddky je mo\u017en\u00e9 pod\u00e1vat do 22.&nbsp;\u00fanora 2021, 10:00 hodin a&nbsp;p\u0159edpokl\u00e1dan\u00fd term\u00edn uzav\u0159en\u00ed smlouvy s&nbsp;dodavatelem je konec 1.&nbsp;pololet\u00ed 2021. Detailn\u00ed informace o&nbsp;zak\u00e1zce na rekonstrukci Libe\u0148sk\u00e9ho mostu jsou uve\u0159ejn\u011bny na profilu zadavatele: <a href=\"https:\/\/www.tsk-praha.cz\/wps\/portal\/root\/o-spolecnosti\/verejne-zakazky-as\">https:\/\/www.tsk-praha.cz\/wps\/portal\/root\/o-spolecnosti\/verejne-zakazky-as<\/a><\/strong><\/p>","protected":false},"excerpt":{"rendered":"[perex] Technick\u00e1 spr\u00e1va komunikaci hl. m. Prahy (TSK) vypsala ve\u0159ejn\u00e9 zak\u00e1zky na rekonstrukci Libe\u0148sk\u00e9ho mostu a&nbsp;na spr\u00e1vce stavby a&nbsp;koordin\u00e1tora cel\u00e9 akce. P\u0159edm\u011btem prvn\u00ed ve\u0159ejn\u00e9 zak\u00e1zky je v\u00fdb\u011br dodavatele stavebn\u00edch prac\u00ed a&nbsp;souvisej\u00edc\u00edch projek\u010dn\u00edch a&nbsp;in\u017een\u00fdrsk\u00fdch \u010dinnost\u00ed. V\u00fdb\u011br prob\u011bhne podle standard\u016f FIDIC \u2013 Yellow book, tedy projekt typu Desing &amp; Build. \u00da\u010delem druh\u00e9 ve\u0159ejn\u00e9 zak\u00e1zky je v\u00fdb\u011br spr\u00e1vce [&hellip;]","protected":false},"author":5,"featured_media":43071,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[34],"tags":[],"_links":{"self":[{"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/posts\/43067"}],"collection":[{"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/comments?post=43067"}],"version-history":[{"count":2,"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/posts\/43067\/revisions"}],"predecessor-version":[{"id":43072,"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/posts\/43067\/revisions\/43072"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/media\/43071"}],"wp:attachment":[{"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/media?parent=43067"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/categories?post=43067"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/tags?post=43067"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}