    
{"id":31018,"date":"2019-11-07T16:34:06","date_gmt":"2019-11-07T15:34:06","guid":{"rendered":"https:\/\/www.praha7.cz\/?p=31018"},"modified":"2019-11-07T16:34:06","modified_gmt":"2019-11-07T15:34:06","slug":"praha-zacala-stavet-trojskou-lavku","status":"publish","type":"post","link":"https:\/\/www.praha7.cz\/praha-zacala-stavet-trojskou-lavku\/","title":{"rendered":"Praha za\u010dala stav\u011bt Trojskou l\u00e1vku"},"content":{"rendered":"<p>[perex]<\/p>\r\n<p>Ze Stromovky do zoo se budou moci Pra\u017ean\u00e9 p\u0159\u00ed\u0161t\u00ed rok znovu dostat p\u0159es l\u00e1vku, jej\u00ed\u017e stavba dnes za\u010dala. Zhotovitel stavby, spole\u010dnost SMP CZ, a.s., na za\u010d\u00e1tku t\u00fddne zah\u00e1jil p\u0159\u00edpravu staveni\u0161t\u011b a&nbsp;budov\u00e1n\u00ed z\u00e1zem\u00ed, pr\u00e1ce za\u010dnou na pil\u00ed\u0159\u00edch a&nbsp;jejich hlubinn\u00e9m zalo\u017een\u00ed. Nov\u00e1 Trojsk\u00e1 l\u00e1vka hlavn\u00ed m\u011bsto p\u0159ijde na 128&nbsp;248&nbsp;653&nbsp;K\u010d.<\/p>\r\n<p>[\/perex]<\/p>\r\n<p><em>\u201eDoh\u00e1n\u00edme v\u00a0Praze dluhy minulosti. Stavby podobn\u00e9ho rozsahu a&nbsp;charakteru zpravidla trvaj\u00ed od za\u010d\u00e1tku sout\u011b\u017ee zpracovatel\u016f k\u00a0hotov\u00e9 stavb\u011b zhruba \u010dty\u0159i roky. N\u00e1m se tento proces poda\u0159ilo o&nbsp;rok zkr\u00e1tit. Nov\u00e1 Trojsk\u00e1 l\u00e1vka bude \u0161irok\u00e1 minim\u00e1ln\u011b \u010dty\u0159i metry a&nbsp;nov\u011b na ni budou moci spole\u010dn\u011b fungovat p\u011b\u0161\u00ed i&nbsp;cyklist\u00e9. V\u00a0p\u0159\u00edpad\u011b pot\u0159eby po n\u00ed p\u0159ejede tak\u00e9 vozidlo Integrovan\u00e9ho z\u00e1chrann\u00e9ho syst\u00e9mu,\u201c<\/em> \u0159ekl n\u00e1m\u011bstek prim\u00e1tora pro oblast dopravy Adam Scheinherr.<\/p>\r\n<p><em>\u201eTrojsk\u00e1 l\u00e1vka je jednou z&nbsp;dal\u0161\u00edch staveb, kter\u00fdmi chce spole\u010dnost SMP CZ p\u0159isp\u011bt ke zkvalitn\u011bn\u00ed dopravn\u00ed dostupnosti v&nbsp;hlavn\u00edm m\u011bst\u011b. Jako p\u016fvodem ryze mosta\u0159sk\u00e1 firma t\u00edmto projektem navazujeme na v\u00fdstavbu a&nbsp;opravy \u0159ady mostn\u00edch staveb v&nbsp;Praze \u2013 mosty na okruhu kolem Prahy, opravu Nuselsk\u00e9ho mostu, anebo t\u0159eba opravu Karlova mostu. Mosty i&nbsp;l\u00e1vky spojuj\u00ed odd\u011blen\u00e9 b\u0159ehy, a&nbsp;to je n\u00e1\u0161 hlavn\u00ed vklad do projektu,\u201c<\/em> \u0159ekl mluv\u010d\u00ed spole\u010dnosti SMP CZ, a.s., Pavel Kamen\u00edk.<\/p>\r\n<p>Stavba mezi Trojou a&nbsp;C\u00edsa\u0159sk\u00fdm ostrovem nebude pouze vizu\u00e1ln\u011b jin\u00e1, jej\u00ed konstrukce bude kvalitn\u011bj\u0161\u00ed a&nbsp;snadn\u011bj\u0161\u00ed na kontrolu stavu. Z\u0159\u00edcenou l\u00e1vku vyst\u0159\u00edd\u00e1 nov\u00e1 ocelov\u011b vyztu\u017een\u00e1 konstrukce s&nbsp;\u017eivotnost\u00ed 100 let. Oproti p\u016fvodn\u00ed l\u00e1vce nebude zevnit\u0159 korodovat a&nbsp;jej\u00ed stav bude mo\u017en\u00e9 \u00fa\u010dinn\u011b kontrolovat. Je navr\u017eena tak, aby existoval snadn\u00fd p\u0159\u00edstup k&nbsp;ocelov\u00fdm lan\u016fm a&nbsp;bylo jak efektivn\u011b zjistit jejich moment\u00e1ln\u00ed stav.<\/p>\r\n<p>P\u0159i v\u00fdb\u011bru zhotovitele Trojsk\u00e9 l\u00e1vky se uk\u00e1zalo, jak se maj\u00ed v\u00fdznamn\u00e9 dopravn\u00ed stavby v&nbsp;Praze sout\u011b\u017eit. Nez\u00e1le\u017eelo jen na cen\u011b, ale tak\u00e9 na odborn\u00e9 kvalifikaci, aby nov\u00e1 l\u00e1vka m\u011bla \u0161pi\u010dkovou kvalitu.\u00a0Kvalifikovat se mohly jenom spole\u010dnosti odborn\u011b a&nbsp;ekonomicky zdatn\u00e9 a&nbsp;p\u0159edev\u0161\u00edm technicky zp\u016fsobil\u00e9. Spole\u010dnost SMP CZ se musela prok\u00e1zat tak\u00e9 seznamem hotov\u00fdch stavebn\u00edch prac\u00ed, seznamem technik\u016f, osv\u011bd\u010den\u00edmi o&nbsp;vzd\u011bl\u00e1n\u00ed a&nbsp;odborn\u00e9 kvalifikaci a&nbsp;popisem technick\u00e9ho vybaven\u00ed, se kter\u00fdm bude pracovat.<\/p>\r\n<p><em>\u201ePraha pot\u0159ebuje p\u0159esn\u011b takov\u00e9 kvalitn\u00ed mosty. Dluh, kter\u00fd na mostech m\u011bsto m\u00e1, v\u0161ichni Pra\u017ean\u00e9 znaj\u00ed. Vedle nov\u00e9 podoby sout\u011b\u017e\u00ed chystan\u00fdch staveb jsem proto pos\u00edlil tak\u00e9 kontrolu most\u016f a&nbsp;o&nbsp;rekonstrukc\u00edch se nyn\u00ed rozhoduje na z\u00e1klad\u011b v\u00edce podrobn\u00fdch technick\u00fdch pr\u016fzkum\u016f. Prov\u00e1d\u00edme tak\u00e9 zat\u011b\u017eovac\u00ed zkou\u0161ky, d\u00edky kter\u00fdm most pozn\u00e1me skute\u010dn\u011b do detail\u016f a&nbsp;rekonstrukci napl\u00e1nujeme rychlej\u0161\u00ed a&nbsp;kvalitn\u011bj\u0161\u00ed,&#8220;<\/em> popsal Adam Scheinherr a&nbsp;pokra\u010doval: <em>\u201eZ\u00e1rove\u0148 Klokner\u016fv \u00fastav \u010cVUT dod\u011blal pro Technickou spr\u00e1vu komunikac\u00ed hlavn\u00edho m\u011bsta dlouhodobou koncepci \u00fadr\u017eby a&nbsp;oprav most\u016f s&nbsp;p\u0159edpjatou nosnou konstrukc\u00ed, na kter\u00e9 na m\u016fj popud za\u010dal pracovat. Je to materi\u00e1l, ve kter\u00e9 je navr\u017een postup p\u0159i p\u00e9\u010di o&nbsp;tyto konstrukce.\u201c<\/em><\/p>\r\n<p>&nbsp;<\/p>\r\n<p><img loading=\"lazy\" src=\"https:\/\/www.praha7.cz\/wp-content\/uploads\/2019\/05\/trojska-lavka_panel-1-600x324.jpg\" alt=\"\" width=\"600\" height=\"324\" class=\"alignnone size-medium wp-image-26359\" srcset=\"https:\/\/www.praha7.cz\/wp-content\/uploads\/2019\/05\/trojska-lavka_panel-1-600x324.jpg 600w, https:\/\/www.praha7.cz\/wp-content\/uploads\/2019\/05\/trojska-lavka_panel-1-768x415.jpg 768w, https:\/\/www.praha7.cz\/wp-content\/uploads\/2019\/05\/trojska-lavka_panel-1-1500x810.jpg 1500w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/p>","protected":false},"excerpt":{"rendered":"[perex] Ze Stromovky do zoo se budou moci Pra\u017ean\u00e9 p\u0159\u00ed\u0161t\u00ed rok znovu dostat p\u0159es l\u00e1vku, jej\u00ed\u017e stavba dnes za\u010dala. Zhotovitel stavby, spole\u010dnost SMP CZ, a.s., na za\u010d\u00e1tku t\u00fddne zah\u00e1jil p\u0159\u00edpravu staveni\u0161t\u011b a&nbsp;budov\u00e1n\u00ed z\u00e1zem\u00ed, pr\u00e1ce za\u010dnou na pil\u00ed\u0159\u00edch a&nbsp;jejich hlubinn\u00e9m zalo\u017een\u00ed. Nov\u00e1 Trojsk\u00e1 l\u00e1vka hlavn\u00ed m\u011bsto p\u0159ijde na 128&nbsp;248&nbsp;653&nbsp;K\u010d. [\/perex] \u201eDoh\u00e1n\u00edme v\u00a0Praze dluhy minulosti. Stavby podobn\u00e9ho [&hellip;]","protected":false},"author":5,"featured_media":31019,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[34,74],"tags":[],"_links":{"self":[{"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/posts\/31018"}],"collection":[{"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/comments?post=31018"}],"version-history":[{"count":1,"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/posts\/31018\/revisions"}],"predecessor-version":[{"id":31020,"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/posts\/31018\/revisions\/31020"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/media\/31019"}],"wp:attachment":[{"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/media?parent=31018"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/categories?post=31018"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/tags?post=31018"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}