    
{"id":10609,"date":"2017-12-05T22:32:43","date_gmt":"2017-12-05T21:32:43","guid":{"rendered":"https:\/\/praha7.cz\/?page_id=10609"},"modified":"2017-12-05T22:32:43","modified_gmt":"2017-12-05T21:32:43","slug":"rozpocet-2014","status":"publish","type":"page","link":"https:\/\/www.praha7.cz\/temata\/otevrena-radnice\/rozpocet\/rozpocet-2014\/","title":{"rendered":"Rozpo\u010det 2014"},"content":{"rendered":"<h3 style=\"text-align: center;\">Usnesen\u00ed rady M\u010c Praha&nbsp;7<\/h3>\r\n<p style=\"text-align: center;\"><strong>N\u00e1vrh k&nbsp;rozpo\u010dtu M\u010c Praha&nbsp;7 na rok 2014 &#8211; hlavn\u00ed \u010dinnost<\/strong><br \/>\r\n<strong>\u010d. 0055\/14<\/strong><\/p>\r\n<p style=\"text-align: center;\"><strong>Ze dne 28.01.2014<\/strong><\/p>\r\n<hr \/>\r\n<p>Rada M\u010c P7 po projedn\u00e1n\u00ed<\/p>\r\n<ol>\r\n\t<li>Bere na v\u011bdom\u00ed\r\n\r\n<ol>\r\n\t<li>p\u0159edlo\u017een\u00fd materi\u00e1l &#8211; n\u00e1vrh k&nbsp;rozpo\u010dtu M\u010c Praha&nbsp;7 na rok 2014 &#8211; hlavn\u00ed \u010dinnost<\/li>\r\n<\/ol>\r\n<\/li>\r\n\t<li>Souhlas\u00ed\r\n\r\n<ol>\r\n\t<li>s t\u00edm, \u017ee n\u00e1vrh rozpo\u010dtu M\u010c Praha&nbsp;7 na rok 2014 byl sestaven v&nbsp;n\u00e1vaznosti na ukazatele a&nbsp;objem dotac\u00ed pro M\u010c dle usnesen\u00ed Z&nbsp;HMP \u010d. 33\/1 z&nbsp;12.12.2013 mimo jin\u00e9 k&nbsp;dota\u010dn\u00edm vztah\u016fm k&nbsp;m\u011bstsk\u00fdm \u010d\u00e1stem hl.m. Prahy na r. 2013 &#8211; p\u0159\u00edloha \u010d. 9 k&nbsp;rozpisu dotac\u00ed z&nbsp;HMP (schv\u00e1leno) a&nbsp;p\u0159\u00edloha \u010d. 10 k&nbsp;rozpisu dotac\u00ed ze st\u00e1tn\u00edho rozpo\u010dtu (schv\u00e1leno s&nbsp;v\u00fdhradou, \u017ee v&nbsp;n\u00e1vaznosti na p\u0159\u00edpadn\u00e9 zm\u011bny vl\u00e1dn\u00edho n\u00e1vrhu finan\u010dn\u00edho vztahu st\u00e1tn\u00edho rozpo\u010dtu k&nbsp;rozpo\u010dtu hl.m. Prahy bude rozd\u011blen\u00ed aktualizov\u00e1no); provedeno v&nbsp;souladu s&nbsp;usnes. R HMP \u010d. 84 z&nbsp;14.1.2014 k&nbsp;n\u00e1vrhu \u00fapravy v&nbsp;r\u00e1mci schv\u00e1len\u00e9ho rozpo\u010dtu hl.m. Prahy &#8211; bez dopadu do dota\u010dn\u00edch vztah\u016f k&nbsp;M\u010c Praha&nbsp;7);<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>s t\u00edm, \u017ee v&nbsp;p\u0159\u00edpad\u011b event. dal\u0161\u00edch zm\u011bn v&nbsp;upraven\u00fdch verz\u00edch schv\u00e1len\u00e9ho rozpo\u010dtu vlastn\u00edho hl.m. Prahy na rok 2014 nebo p\u0159i negativn\u00edch zm\u011bn\u00e1ch v&nbsp;oblasti dota\u010dn\u00edch vztah\u016f z&nbsp;vy\u0161\u0161\u00edch rozpo\u010dt\u016f bude p\u0159\u00edpadn\u00fd propad vykryt vlastn\u00edmi zdroji M\u010c Praha&nbsp;7, a&nbsp;to pol. &#8222;financov\u00e1n\u00ed&#8220; tj. zapojen\u00edm vy\u0161\u0161\u00edho objemu fin. prost\u0159edk\u016f z&nbsp;minul\u00fdch let, po prov\u011b\u0159en\u00ed mo\u017enost\u00ed regulac\u00ed v\u00fddajov\u00e9 str\u00e1nky rozpo\u010dtu;<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>s t\u00edm, \u017ee v&nbsp;kapitole 04 &#8211; \u0161kolstv\u00ed se neprom\u00edt\u00e1 rozpo\u010det b\u011b\u017en\u00fdch v\u00fddaj\u016f na p\u0159\u00edm\u00e9 n\u00e1klady \u0161kol a&nbsp;\u0161kolsk\u00fdch za\u0159\u00edzen\u00ed ze st\u00e1tn\u00edho rozpo\u010dtu, za kter\u00fd se pova\u017euje rozpo\u010det p\u0159edan\u00fd M\u0160MT, nebo\u0165 v&nbsp;souvislosti s&nbsp;platn\u00fdm \u0161kolsk\u00fdm z\u00e1konem je k&nbsp;t\u00e9to oblasti p\u0159\u00edmo p\u0159\u00edslu\u0161n\u00fd krajsk\u00fd \u00fa\u0159ad;<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>s t\u00edm, \u017ee p\u0159i sestav\u011b n\u00e1vrhu rozpo\u010dtu bylo vyu\u017eito dostupn\u00fdch zdroj\u016f a&nbsp;objem da\u0148ov\u00fdch p\u0159\u00edjm\u016f p\u0159edstavuje 45&nbsp;595,0 tis.K\u010d (pokles oproti SR r. 2013 o&nbsp;2,1 %, absolutn\u011b o&nbsp;961,8 tis.K\u010d), objem neda\u0148ov\u00fdch p\u0159\u00edjm\u016f p\u0159estavuje 4&nbsp;906,0 tis.K\u010d (pokles oproti SR r. 2013 o&nbsp;23,4 %, absolutn\u011b o&nbsp;1&nbsp;500,0 tis.K\u010d), neinvesti\u010dn\u00ed dotace ze st\u00e1tn\u00edho rozpo\u010dtu 22&nbsp;675,0 tis.K\u010d (n\u00e1r\u016fst o&nbsp;0,7&nbsp;% oproti SR r. 2013, absolutn\u011b o&nbsp;151,0 tis.K\u010d), neinvesti\u010dn\u00ed dotace z&nbsp;HMP 104&nbsp;301,0 tis.K\u010d (n\u00e1r\u016fst o&nbsp;4,9&nbsp;% oproti SR r. 2013, absolutn\u011b o&nbsp;4&nbsp;903,0 tis.K\u010d &#8211; kompenzace do oblasti \u0161kolstv\u00ed ve vazb\u011b na zru\u0161en\u00ed p\u0159\u00edsp\u011bvku ze st\u00e1tn\u00edho rozpo\u010dtu v&nbsp;souvislosti s&nbsp;novelou rozpo\u010dtov\u00e9ho ur\u010den\u00ed dan\u00ed), p\u0159evody ze zda\u0148ovan\u00e9 \u010dinnosti celkem v&nbsp;objemu 28&nbsp;200,0 tis.K\u010d (pokles oproti SR r. 2013 o&nbsp;13,3 %, absolutn\u011b o&nbsp;4&nbsp;306,7 tis.K\u010d). \u00da\u010delov\u00e9 fondy m\u011bstsk\u00e9 \u010d\u00e1sti a&nbsp;polo\u017eka &#8222;financov\u00e1n\u00ed&#8220; jsou zahrnuty v&nbsp;rozpo\u010dtu vysok\u00fdm objemem 154&nbsp;135,2 tis.K\u010d (pokles o&nbsp;16,2&nbsp;% oproti SR r. 2013, absolutn\u011b o&nbsp;29&nbsp;776,6 tis.K\u010d &#8211; vliv p\u0159evod\u016f z&nbsp;UR r. 2013 do SR r. 2014 v\u010d. zdroj\u016f financov\u00e1n\u00ed, zapojen\u00ed vytvo\u0159en\u00fdch rezerv pro sestavu SR r. 2014, vykryt\u00ed propadu vlastn\u00edch p\u0159\u00edjm\u016f apod.);<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>s t\u00edm, \u017ee investi\u010dn\u00ed \u010d\u00e1st rozpo\u010dtu musela b\u00fdt vzhledem k&nbsp;neinvesti\u010dn\u00edm pot\u0159eb\u00e1m M\u010c z\u010d\u00e1sti redukov\u00e1na; n\u00e1vrh schv\u00e1len\u00e9 verze je v&nbsp;tabulce \u010d. 5, kter\u00e1 sumarizuje akce p\u0159ev\u00e1d\u011bn\u00e9 z&nbsp;rozpo\u010dtu r. 2013 (tab. \u010d. 5 A) a&nbsp;akce nov\u011b za\u0159azovan\u00e9 do rozpo\u010dtu r. 2014 (tab. \u010d. 5 B); za\u0159azen\u00ed \u00faspor z&nbsp;akc\u00ed zru\u0161en\u00fdch nebo zp\u0159esn\u011bn\u00fdch v&nbsp;kalkulaci pot\u0159eb (tab. \u010d. 7), akce do SR z&nbsp;\u00fa\u010dtu doprivatizace konkr\u00e9tn\u011b 7&nbsp;000,0 tis.K\u010d pro &#8222;Z\u0160 Korunova\u010dn\u00ed &#8211; reko \u0161aten a&nbsp;suter\u00e9nu&#8220; (tab. \u010d. 10)<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>s t\u00edm, \u017ee z&nbsp;v\u00fdnos\u016f ze z\u00f3ny placen\u00e9ho st\u00e1n\u00ed za r. 2012, kter\u00e9 byly p\u0159edm\u011btem \u00fapravy rozpo\u010dtu r. 2013 s&nbsp;ur\u010den\u00edm pro vyu\u017eit\u00ed v&nbsp;r. 2014 (ve smyslu usnes. Z&nbsp;M\u010c \u010d. 0134\/13 z&nbsp;9.12.2013), v&nbsp;objemu 11&nbsp;973,8 tis.K\u010d (tab.\u010d. 8) budou financov\u00e1ny tyto akce:<br \/>\r\n<br \/>\r\n6.1\u00a0Reko komunikac\u00ed v&nbsp;oblasti metra Vltavsk\u00e1 5&nbsp;239,1 tis.K\u010d Obnova ve\u0159ej.osv\u011btlen\u00ed a&nbsp;vodn\u00edho prvku \u0158ez\u00e1\u010dovo n\u00e1m. 794,0 tis.K\u010d (investi\u010dn\u00ed charakter v\u00fddaj\u016f)<br \/>\r\n6.2\u00a0Do\u010di\u0161\u0165ov\u00e1n\u00ed chodn\u00edk\u016f, \u00faklid a&nbsp;obdobn\u00e9 v\u00fddaje 3&nbsp;609,8 tis.K\u010d Zaji\u0161t\u011bn\u00ed \u010dinnost\u00ed v\u00fddejen 2&nbsp;330,9 tis.K\u010d (neinvesti\u010dn\u00ed charakter v\u00fddaj\u016f)<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>se za\u0159azen\u00edm p\u0159evod\u016f z&nbsp;UR r. 2013 &#8211; zapojen\u00ed dotace ve v\u00fd\u0161i 50% z&nbsp;odvodu z&nbsp;VHP aj.tech.her.za\u0159\u00edzen\u00ed za 2.&nbsp;a&nbsp;3.&nbsp;\u010dtvrtlet\u00ed 2013 k&nbsp;vyu\u017eit\u00ed v&nbsp;r. 2014 &#8211; celkem objem 5&nbsp;083,0 tis.K\u010d (tab. \u010d. 9)<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>se zru\u0161en\u00edm vybran\u00fdch invest. a&nbsp;neinvest. akc\u00ed, event. s&nbsp;upravenou kalkulac\u00ed n\u00e1klad\u016f do SR r. 2014, a&nbsp;s&nbsp;vyu\u017eit\u00edm dostupn\u00fdch rezerv rozpo\u010dtu minul\u00fdch let &#8211; uvoln\u011bn\u00e9 rozpo\u010dtov\u00e9 prost\u0159edky za\u0159azeny do konkr\u00e9tn\u00edch v\u00fddaj\u016f (tab. \u010d.7)<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>s n\u00e1vrhem rozpo\u010dtu \u00fa\u010delov\u00fdch fond\u016f hlavn\u00ed \u010dinnosti na rok 2014 v\u010d. konkr\u00e9tn\u00edho pou\u017eit\u00ed \u010d\u00e1sti fin. prost\u0159edk\u016f z&nbsp;FRR (dar 3&nbsp;000,0 tis.K\u010d), Ekologick\u00e9ho fondu (dary 206,0 tis.K\u010d), Fondu bydlen\u00ed (dary 10&nbsp;675,2 tis.K\u010d)<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>s t\u00edm, \u017ee oblast b\u011b\u017en\u00fdch v\u00fddaj\u016f bude v&nbsp;r\u00e1mci I.\u010dtvrtlet\u00ed roku 2014 podrobena anal\u00fdze s&nbsp;c\u00edlem nalezen\u00ed \u00faspor, kter\u00e9 budou n\u00e1sledn\u011b pou\u017eity k&nbsp;pos\u00edlen\u00ed ne\u00fa\u010delov\u00e9 neinvesti\u010dn\u00ed rezervy v&nbsp;ORJ OFI kapitola 1015, v&nbsp;p\u0159\u00edpad\u011b vyhodnocen\u00ed nezbytnosti pro zapojen\u00ed do konkr\u00e9tn\u00edch neinvesti\u010dn\u00edch eventueln\u011b investi\u010dn\u00edch v\u00fddaj\u016f dle pot\u0159eb;<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>se zmocn\u011bn\u00edm R M\u010c ke schvalov\u00e1n\u00ed rozpo\u010dtov\u00fdch opat\u0159en\u00ed charakteru p\u0159esun\u016f z&nbsp;investi\u010dn\u00ed \u010d\u00e1sti rozpo\u010dtu do neinvesti\u010dn\u00ed \u010d\u00e1sti rozpo\u010dtu po vyhodnocen\u00ed pot\u0159eb a&nbsp;charakteru v\u00fddaj\u016f u&nbsp;akc\u00ed za\u0159azen\u00fdch do rozpo\u010dtu (nap\u0159. v&nbsp;n\u00e1vaznosti na uzav\u00edr\u00e1n\u00ed smluvn\u00edch vztah\u016f), a&nbsp;to bez omezen\u00ed;<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>se zmocn\u011bn\u00edm R M\u010c ke schvalov\u00e1n\u00ed rozpo\u010dtov\u00fdch opat\u0159en\u00ed charakteru p\u0159esun\u016f mezi akcemi v&nbsp;rozpo\u010dtu se zdrojem kryt\u00ed z&nbsp;\u00fa\u010dtu doprivatizace podle vyhodnocen\u00ed aktu\u00e1ln\u00edch pot\u0159eb fin. prost\u0159edk\u016f pro schv\u00e1len\u00e9 akce;<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>se zmocn\u011bn\u00edm R M\u010c ke schvalov\u00e1n\u00ed rozpo\u010dtov\u00fdch opat\u0159en\u00ed charakteru p\u0159esun\u016f v&nbsp;p\u0159\u00edpad\u011b nutnosti dokryt\u00ed investi\u010dn\u00edch pot\u0159eb v&nbsp;r\u00e1mci akc\u00ed za\u0159azen\u00fdch do rozpo\u010dtu pou\u017eit\u00edm neinvesti\u010dn\u00edch rezerv, vytvo\u0159en\u00fdch v&nbsp;rozpo\u010dtu (p\u0159esun z&nbsp;neinvest. \u010d\u00e1sti do invest. \u010d\u00e1sti rozpo\u010dtu);<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>se zmocn\u011bn\u00edm ved. OFI ke schvalov\u00e1n\u00ed \u00faprav rozpo\u010dtu resp. rozpo\u010dtov\u00fdch opat\u0159en\u00ed charakteru v\u011bcn\u00fdch zm\u011bn (nap\u0159. mezi odd.\u00a7, mezi polo\u017ekami rozpo\u010dtov\u00e9 skladby, p\u0159esun\u016f mezi ORJ za p\u0159edpokladu souhlasu ved. ORJ event. \u010dlen\u016f R M\u010c dle p\u0159id\u011blen\u00fdch kompetenc\u00ed apod.), vyjma p\u0159esun\u016f z&nbsp;neinvesti\u010dn\u00ed do investi\u010dn\u00ed \u010d\u00e1sti rozpo\u010dtu a&nbsp;naopak;<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>s t\u00edm, \u017ee tvorba a&nbsp;kone\u010dn\u00e9 zpracov\u00e1n\u00ed n\u00e1vrhu rozpo\u010dtu M\u010c Praha&nbsp;7 na rok 2014 prob\u00edhalo mimo jin\u00e9 i&nbsp;v&nbsp;intenc\u00edch vyhl\u00e1\u0161ky \u010d. 416\/2004 Sb., kterou se prov\u00e1d\u00ed z\u00e1kon \u010d. 320\/2001 Sb., o&nbsp;finan\u010dn\u00ed kontrole ve ve\u0159ejn\u00e9 spr\u00e1v\u011b a&nbsp;o&nbsp;zm\u011bn\u011b n\u011bkter\u00fdch z\u00e1kon\u016f (z\u00e1kon o&nbsp;finan\u010dn\u00ed kontrole &#8211; p\u0159edb\u011b\u017en\u00e1 \u0159\u00edd\u00edc\u00ed finan\u010dn\u00ed kontrola), ve zn\u011bn\u00ed p.p.;<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>s t\u00edm, \u017ee n\u00e1vrh rozpo\u010dtu M\u010c Praha&nbsp;7 na rok 2014 je p\u0159edkl\u00e1d\u00e1n v&nbsp;souladu se z\u00e1konem \u010d. 131\/2000 Sb., o&nbsp;hlavn\u00edm m\u011bst\u011b Praze ve zn\u011bn\u00ed p.p., Statutem hl.m. Prahy v&nbsp;platn\u00e9m zn\u011bn\u00ed a&nbsp;z\u00e1konem \u010d. 250\/2000 Sb., o&nbsp;rozpo\u010dtov\u00fdch pravidlech \u00fazemn\u00edch rozpo\u010dt\u016f, ve zn\u011bn\u00ed p.p., a&nbsp;je vyj\u00e1d\u0159en takto:<br \/>\r\n<br \/>\r\n16.1\u00a0objem p\u0159\u00edjm\u016f 205&nbsp;677,0 tis.K\u010d<br \/>\r\n16.2\u00a0objem v\u00fddaj\u016f 359&nbsp;812,2 tis.K\u010d<br \/>\r\n16.3\u00a0schodek 154&nbsp;135,2 tis.K\u010d<br \/>\r\n16.4\u00a0financov\u00e1n\u00ed 154&nbsp;135,2 tis.K\u010d Pl\u00e1novan\u00fd schodek je kryt t\u0159\u00eddou 8 &#8211; financov\u00e1n\u00ed. Objem zdroj\u016f se zapojen\u00edm polo\u017eky &#8222;financov\u00e1n\u00ed&#8220; p\u0159edstavuje 359&nbsp;812,2 tis.K\u010d.<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>s t\u00edm, \u017ee &#8222;Pravidla dopl\u0148kov\u00e9 \u010dinnosti PO z\u0159\u00edzen\u00fdch M\u010c Praha&nbsp;7 na rok 2014&#8220; a&nbsp;&#8222;Pravidla PO (z\u0159\u00edzen\u00fdch M\u010c Praha&nbsp;7) pro rok 2014 pro finan\u010dn\u00ed vypo\u0159\u00e1d\u00e1n\u00ed hlavn\u00ed \u010dinnosti a&nbsp;hospoda\u0159en\u00ed s&nbsp;fondy&#8220; pro oblast \u0161kolstv\u00ed i&nbsp;mimo oblast \u0161kolstv\u00ed byla zpracov\u00e1na na z\u00e1klad\u011b usnesen\u00ed R HMP \u010d. 2370 z&nbsp;3.&nbsp;12.&nbsp;2013 se zm\u011bnou dle \u010d. 2631 z&nbsp;20.12.2013<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>s t\u00edm, \u017ee financov\u00e1n\u00ed protidrogov\u00e9 politiky a&nbsp;grantov\u00e9ho programu M\u010c Praha&nbsp;7 v&nbsp;r\u00e1mci rozpo\u010dtu r. 2014 v&nbsp;p\u0159\u00edpad\u011b pot\u0159eby bude realizov\u00e1no prost\u0159ednictv\u00edm poskytov\u00e1n\u00ed \u00fa\u010delov\u00fdch neinvesti\u010dn\u00edch p\u0159\u00edsp\u011bvk\u016f na z\u00e1klad\u011b samostatn\u00fdch smluv u&nbsp;PO z\u0159\u00edzen\u00fdch M\u010c Praha&nbsp;7;<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>s t\u00edm, \u017ee rozpis schv\u00e1len\u00e9ho rozpo\u010dtu a&nbsp;\u00fapravy v&nbsp;pr\u016fb\u011bhu roku v&nbsp;\u010dlen\u011bn\u00ed dle aktu\u00e1ln\u011b platn\u00e9 rozpo\u010dtov\u00e9 skladby (RS) a&nbsp;metodiky MHMP m\u016f\u017ee b\u00fdt zp\u0159esn\u011bno v&nbsp;elektronick\u00e9m zpracov\u00e1n\u00ed rozpo\u010dtu a&nbsp;jeho \u00faprav (p\u0159\u00edpadn\u00e1 vazba i&nbsp;na zm\u011bnu ORJ event. vznik nov\u00e9 ORJ dle metodiky apod.)<br \/>\r\n<br \/>\r\n<\/li>\r\n<\/ol>\r\n<\/li>\r\n\t<li>Schvaluje\r\n\r\n<ol>\r\n\t<li>p\u0159edlo\u017een\u00fd n\u00e1vrh usnesen\u00ed k&nbsp;rozpo\u010dtu M\u010c Praha&nbsp;7 &#8211; hlavn\u00ed \u010dinnost na rok 2014 v\u010d. v\u0161ech p\u0159\u00edloh pro zased\u00e1n\u00ed Z&nbsp;M\u010c P\/7 dne 17.02.2014<br \/>\r\n<br \/>\r\n<\/li>\r\n<\/ol>\r\n<\/li>\r\n\t<li>Ukl\u00e1d\u00e1\r\n\r\n<ol>\r\n\t<li>Ur\u010den:\u00a0VED OFI Pelka Petr Ing.<br \/>\r\n1.1 \u00dakol:\u00a0p\u0159ipravit informaci k&nbsp;n\u00e1vrhu rozpo\u010dtu M\u010c Praha&nbsp;7 na rok 2014 &#8211; hlavn\u00ed \u010dinnost ke zve\u0159ejn\u011bn\u00ed (z\u00e1kon \u010d. 250\/2000 Sb., o&nbsp;rozpo\u010dtov\u00fdch pravidlech \u00fazemn\u00edch rozpo\u010dt\u016f, ve zn\u011bn\u00ed p.p.);<br \/>\r\n1.2 Term\u00edn:\u00a030.01.2014<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>Ur\u010den:\u00a0ZAS STA Ka\u0161tovsk\u00fd Tom\u00e1\u0161 MUDr.<br \/>\r\n2.1 \u00dakol:\u00a0p\u0159edlo\u017eit n\u00e1vrh rozpo\u010dtu M\u010c Praha&nbsp;7 na rok 2014 &#8211; hlavn\u00ed \u010dinnost v\u010detn\u011b v\u0161ech p\u0159\u00edloh k&nbsp;projedn\u00e1n\u00ed na zased\u00e1n\u00ed Z&nbsp;M\u010c P\/7;<br \/>\r\n2.2 Term\u00edn:\u00a017.02.2014<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>Ur\u010den:\u00a0VED KS Strnadov\u00e1 Michaela PaedDr.<br \/>\r\n3.1 \u00dakol:\u00a0Podrobit v&nbsp;r\u00e1mci I. \u010dtvrtlet\u00ed r. 2014 anal\u00fdze sv\u011b\u0159enou oblast dle jednotliv\u00fdch spravovan\u00fdch kapitol rozpo\u010dtu M\u010c Praha&nbsp;7 s&nbsp;c\u00edlem aktualizace nezbytnosti a&nbsp;p\u0159ehodnocen\u00ed v\u00fddajov\u00e9 str\u00e1nky rozpo\u010dtu a&nbsp;z&nbsp;n\u011bj vypl\u00fdvaj\u00edc\u00edch \u00fasporn\u00fdch opat\u0159en\u00ed s&nbsp;v\u00fdsledkem nalezen\u00ed \u00faspor.<br \/>\r\n3.2 Term\u00edn:\u00a030.04.2014<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>Ur\u010den:\u00a0VED KT N\u011bmcov\u00e1 Ivana Ing.<br \/>\r\n4.1 \u00dakol:\u00a0Podrobit v&nbsp;r\u00e1mci I. \u010dtvrtlet\u00ed r. 2014 anal\u00fdze sv\u011b\u0159enou oblast dle jednotliv\u00fdch spravovan\u00fdch kapitol rozpo\u010dtu M\u010c Praha&nbsp;7 s&nbsp;c\u00edlem aktualizace nezbytnosti a&nbsp;p\u0159ehodnocen\u00ed v\u00fddajov\u00e9 str\u00e1nky rozpo\u010dtu a&nbsp;z&nbsp;n\u011bj vypl\u00fdvaj\u00edc\u00edch \u00fasporn\u00fdch opat\u0159en\u00ed s&nbsp;v\u00fdsledkem nalezen\u00ed \u00faspor.<br \/>\r\n4.2 Term\u00edn:\u00a030.04.2014<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>Ur\u010den:\u00a0VED O\u0160K Kucha\u0159 Filip Mgr.<br \/>\r\n5.1 \u00dakol:\u00a0Podrobit v&nbsp;r\u00e1mci I. \u010dtvrtlet\u00ed r. 2014 anal\u00fdze sv\u011b\u0159enou oblast dle jednotliv\u00fdch spravovan\u00fdch kapitol rozpo\u010dtu M\u010c Praha&nbsp;7 s&nbsp;c\u00edlem aktualizace nezbytnosti a&nbsp;p\u0159ehodnocen\u00ed v\u00fddajov\u00e9 str\u00e1nky rozpo\u010dtu a&nbsp;z&nbsp;n\u011bj vypl\u00fdvaj\u00edc\u00edch \u00fasporn\u00fdch opat\u0159en\u00ed s&nbsp;v\u00fdsledkem nalezen\u00ed \u00faspor.<br \/>\r\n5.2 Term\u00edn:\u00a030.04.2014<br \/>\r\n<br \/>\r\n<\/li>\r\n\t<li>Ur\u010den:\u00a0VED ODO Vit\u00e1skov\u00e1 Miloslava<br \/>\r\n6.1 \u00dakol:\u00a0Podrobit v&nbsp;r\u00e1mci I. \u010dtvrtlet\u00ed r. 2014 anal\u00fdze sv\u011b\u0159enou oblast dle jednotliv\u00fdch spravovan\u00fdch kapitol rozpo\u010dtu M\u010c Praha&nbsp;7 s&nbsp;c\u00edlem aktualizace nezbytnosti a&nbsp;p\u0159ehodnocen\u00ed v\u00fddajov\u00e9 str\u00e1nky rozpo\u010dtu a&nbsp;z&nbsp;n\u011bj vypl\u00fdvaj\u00edc\u00edch \u00fasporn\u00fdch opat\u0159en\u00ed s&nbsp;v\u00fdsledkem nalezen\u00ed \u00faspor.<br \/>\r\n6.2 Term\u00edn:\u00a030.04.2014<\/li>\r\n\t<li>Ur\u010den:\u00a0VED OSZ Reme\u0161 Ren\u00e9 Ing.<br \/>\r\n7.1 \u00dakol:\u00a0Podrobit v&nbsp;r\u00e1mci I. \u010dtvrtlet\u00ed r. 2014 anal\u00fdze sv\u011b\u0159enou oblast dle jednotliv\u00fdch spravovan\u00fdch kapitol rozpo\u010dtu M\u010c Praha&nbsp;7 s&nbsp;c\u00edlem aktualizace nezbytnosti a&nbsp;p\u0159ehodnocen\u00ed v\u00fddajov\u00e9 str\u00e1nky rozpo\u010dtu a&nbsp;z&nbsp;n\u011bj vypl\u00fdvaj\u00edc\u00edch \u00fasporn\u00fdch opat\u0159en\u00ed s&nbsp;v\u00fdsledkem nalezen\u00ed \u00faspor.<br \/>\r\n7.2 Term\u00edn:\u00a030.04.2014<\/li>\r\n\t<li>Ur\u010den:\u00a0VED ORZ Str\u00e1nsk\u00fd Stanislav Ing. Arch.<br \/>\r\n8.1 \u00dakol:\u00a0Podrobit v&nbsp;r\u00e1mci I. \u010dtvrtlet\u00ed r. 2014 anal\u00fdze sv\u011b\u0159enou oblast dle jednotliv\u00fdch spravovan\u00fdch kapitol rozpo\u010dtu M\u010c Praha&nbsp;7 s&nbsp;c\u00edlem aktualizace nezbytnosti a&nbsp;p\u0159ehodnocen\u00ed v\u00fddajov\u00e9 str\u00e1nky rozpo\u010dtu a&nbsp;z&nbsp;n\u011bj vypl\u00fdvaj\u00edc\u00edch \u00fasporn\u00fdch opat\u0159en\u00ed s&nbsp;v\u00fdsledkem nalezen\u00ed \u00faspor.<br \/>\r\n8.2 Term\u00edn:\u00a030.04.2014<\/li>\r\n\t<li>Ur\u010den:\u00a0VED O\u017dP Horsk\u00e1 Hana Ing.<br \/>\r\n9.1 \u00dakol:\u00a0Podrobit v&nbsp;r\u00e1mci I. \u010dtvrtlet\u00ed r. 2014 anal\u00fdze sv\u011b\u0159enou oblast dle jednotliv\u00fdch spravovan\u00fdch kapitol rozpo\u010dtu M\u010c Praha&nbsp;7 s&nbsp;c\u00edlem aktualizace nezbytnosti a&nbsp;p\u0159ehodnocen\u00ed v\u00fddajov\u00e9 str\u00e1nky rozpo\u010dtu a&nbsp;z&nbsp;n\u011bj vypl\u00fdvaj\u00edc\u00edch \u00fasporn\u00fdch opat\u0159en\u00ed s&nbsp;v\u00fdsledkem nalezen\u00ed \u00faspor.<br \/>\r\n9.2 Term\u00edn:\u00a030.04.2014<\/li>\r\n\t<li>Ur\u010den:\u00a0VED OMA Kol\u00e1\u0159 Robert Bc.<br \/>\r\n10.1 \u00dakol:\u00a0Podrobit v&nbsp;r\u00e1mci I. \u010dtvrtlet\u00ed r. 2014 anal\u00fdze sv\u011b\u0159enou oblast dle jednotliv\u00fdch spravovan\u00fdch kapitol rozpo\u010dtu M\u010c Praha&nbsp;7 s&nbsp;c\u00edlem aktualizace nezbytnosti a&nbsp;p\u0159ehodnocen\u00ed v\u00fddajov\u00e9 str\u00e1nky rozpo\u010dtu a&nbsp;z&nbsp;n\u011bj vypl\u00fdvaj\u00edc\u00edch \u00fasporn\u00fdch opat\u0159en\u00ed s&nbsp;v\u00fdsledkem nalezen\u00ed \u00faspor.<br \/>\r\n10.2 Term\u00edn:\u00a030.04.2014\u00a0<\/li>\r\n<\/ol>\r\n<\/li>\r\n<\/ol>\r\n<p>&nbsp;<\/p>\r\n<p>starosta M\u011bstsk\u00e9 \u010d\u00e1sti Praha&nbsp;7: Marek Je\u010dm\u00e9nek<br \/>\r\nz\u00e1stupce starosty M\u011bstsk\u00e9 \u010d\u00e1sti Praha&nbsp;7: Daniel \u0160t\u011bp\u00e1n<\/p>\r\n<hr \/>\r\n<p>P\u0159\u00edlohy:<\/p>\r\n<ul>\r\n\t<li><a href=\"https:\/\/praha7.cz\/wp-content\/uploads\/2017\/12\/4-14-p1_sr_2014_d\u016fvod_zpr\u00e1va_platn\u00e1_10_1_2014.doc\">1. D\u016fvodov\u00e1 zpr\u00e1va<\/a><\/li>\r\n\t<li><a href=\"https:\/\/praha7.cz\/wp-content\/uploads\/2017\/12\/4-14-p2.pdf\">2. Rozpis dota\u010dn\u00edch vztah\u016f hl.m. Prahy k&nbsp;M\u010c a&nbsp;rozpis dotac\u00ed ze st\u00e1tn\u00edho rozpo\u010dtu M\u010c hl.m. Prahy na rok 2013 (p\u0159\u00edloha \u010d. 9 k&nbsp;rozpisu dotac\u00ed z&nbsp;HMP a&nbsp;p\u0159\u00edloha \u010d. 10 k&nbsp;rozpisu dotac\u00ed ze st\u00e1tn\u00edho rozpo\u010dtu k&nbsp;usnesen\u00ed Z&nbsp;HMP \u010d. 33\/1 z&nbsp;12.12.2013)<\/a><\/li>\r\n\t<li><a href=\"https:\/\/praha7.cz\/wp-content\/uploads\/2017\/12\/4-14-p3_tab_1_sr_2014_bilance_ke_schv\u00e1len\u00ed.xlsx\">3. Bilance p\u0159\u00edjm\u016f a&nbsp;v\u00fddaj\u016f na rok 2014 &#8211; Tab.1<\/a><\/li>\r\n\t<li><a href=\"https:\/\/praha7.cz\/wp-content\/uploads\/2017\/12\/4-14-p4_tab_2_sr_2014_v\u00fddaje_dle_orj.xlsx\">4. Celkov\u00e9 v\u00fddaje dle ORJ na rok 2014 &#8211; Tab.2<\/a><\/li>\r\n\t<li><a href=\"https:\/\/praha7.cz\/wp-content\/uploads\/2017\/12\/4-14-p5_tab_3_sr_2014_p\u0159\u00edjmy.xlsx\">5. Podrobn\u00e9 \u010dlen\u011bn\u00ed vlastn\u00edch p\u0159\u00edjm\u016f na rok 2014 &#8211; Tab.3<\/a><\/li>\r\n\t<li><a href=\"https:\/\/praha7.cz\/wp-content\/uploads\/2017\/12\/4-14-p6_tab_4_sr_2014_niv_p\u0159\u00edsp\u011bvky_pro_po.xlsx\">6. Neinvesti\u010dn\u00ed p\u0159\u00edsp\u011bvky pr\u00e1vn\u00edm subjekt\u016fm (p\u0159\u00edsp\u011bvkov\u00fdm organizac\u00edm) na rok 2014 &#8211; z\u00e1vazn\u00e9 ukazatele &#8211; Tab.4<\/a><\/li>\r\n\t<li><a href=\"https:\/\/praha7.cz\/wp-content\/uploads\/2017\/12\/4-14-p7_tab_5_5a_5b_a_6_sr_2014_-_investice_velk\u00e9_niv_\u00faspory_a_z\u00e1m\u011bny.xlsx\">7. Rozpo\u010det investi\u010dn\u00edch v\u00fddaj\u016f na rok 2014 &#8211; sumarizace &#8211; Tab.5, P\u0159evody z&nbsp;upraven\u00e9ho rozpo\u010dtu roku 2013 na investice 2014 &#8211; Tab.5A, Nov\u00e9 po\u017eadavky za\u0159azen\u00e9 do rozpo\u010dtu 2014 &#8211; Tab.5B, P\u0159evody z&nbsp;upraven\u00e9ho rozpo\u010dtu 2013 (rozpracovan\u00e9 akce) a&nbsp;nov\u011b za\u0159azen\u00e9<\/a><\/li>\r\n\t<li><a href=\"https:\/\/praha7.cz\/wp-content\/uploads\/2017\/12\/4-14-p8_tab_7_zru\u0161en\u00e9_upraven\u00e9_rezervy_-_vyu\u017eit\u00ed_2014.xlsx\">8. P\u0159ehled zdroj\u016f k&nbsp;nov\u00e9mu vyu\u017eit\u00ed &#8211; Zru\u0161en\u00e9 akce z&nbsp;upraven\u00e9ho rozpo\u010dtu 2013 a&nbsp;pou\u017eit\u00ed zdroj\u016f v&nbsp;rozpo\u010dtu 2014<\/a><\/li>\r\n\t<li><a href=\"https:\/\/praha7.cz\/wp-content\/uploads\/2017\/12\/4-14-p9_tab_8_sr_2014_z\u00f3na_placen\u00e9ho_st\u00e1n\u00ed_k_vyu\u017eit\u00ed_v_r__2014.xlsx\">9. P\u0159evody z&nbsp;upraven\u00e9ho rozpo\u010dtu 2013 &#8211; zapojen\u00ed v\u00fdnos\u016f z\u00f3ny placen\u00e9ho st\u00e1n\u00ed &#8211; Tab.8<\/a><\/li>\r\n\t<li><a href=\"https:\/\/praha7.cz\/wp-content\/uploads\/2017\/12\/4-14-p10_tab_9_loterie_do_sr_2014_2.a3.q_2013.xlsx\">10. P\u0159evody z&nbsp;upraven\u00e9ho rozpo\u010dtu 2013 &#8211; zapojen\u00ed dotace z&nbsp;v\u00fdhern\u00edch hrac\u00edch p\u0159\u00edstroj\u016f &#8211; Tab.9<\/a><\/li>\r\n\t<li><a href=\"https:\/\/praha7.cz\/wp-content\/uploads\/2017\/12\/4-14-p11_tab_10_doprivatizace_2014.xlsx\">11. P\u0159evody ze zda\u0148ovan\u00e9 \u010dinnosti do rozpo\u010dtu 2013 &#8211; zapojen\u00ed v\u00fdnos\u016f z&nbsp;\u00fa\u010dtu doprivatizace &#8211; Tab.10<\/a><\/li>\r\n\t<li><a href=\"https:\/\/praha7.cz\/wp-content\/uploads\/2017\/12\/4-14-p12_sr_2014_fondy.doc\">12. Fondy M\u010c Praha&nbsp;7 na rok 2014<\/a><\/li>\r\n\t<li><a href=\"https:\/\/praha7.cz\/wp-content\/uploads\/2017\/12\/4-14-p13_podklady_oma.pdf\">13. Podklady OMA ke tvorb\u011b n\u00e1vrhu rozpo\u010dtu hlavn\u00ed \u010dinnosti na r. 2014 &#8211; zdroje &#8222;p\u0159evody ze zda\u0148ovan\u00e9 \u010dinnosti do \u010dinnosti hlavn\u00ed&#8220; ze dne 18.12.2013, IS ze dne 20.12.2013, IS ze dne 17.1.2014<\/a><\/li>\r\n\t<li><a href=\"https:\/\/praha7.cz\/wp-content\/uploads\/2017\/12\/4-14-p14_pravidla_\u010dinnosti_pro_po_pro_r__2014.doc\">14. &#8222;Pravidla dopl\u0148kov\u00e9 \u010dinnosti PO z\u0159\u00edzen\u00fdch M\u010c Praha&nbsp;7 na rok 2014&#8220; a&nbsp;&#8222;Pravidla PO (z\u0159\u00edzen\u00fdch M\u010c Praha&nbsp;7) pro rok 2014 pro finan\u010dn\u00ed vypo\u0159\u00e1d\u00e1n\u00ed hlavn\u00ed \u010dinnosti a&nbsp;hospoda\u0159en\u00ed s&nbsp;fondy&#8220; pro oblast \u0161kolstv\u00ed i&nbsp;mimo oblast \u0161kolstv\u00ed<\/a><\/li>\r\n\t<li>15. Z\u00e1pis z&nbsp;jedn\u00e1n\u00ed FV Z&nbsp;M\u010c P\/7 ze dne 27.1.2014 (Bohu\u017eel tato p\u0159\u00edloha nen\u00ed v&nbsp;elektronick\u00e9 podob\u011b)<\/li>\r\n\t<li><a href=\"https:\/\/praha7.cz\/wp-content\/uploads\/2017\/12\/4-14-zmc2.doc\">16. N\u00e1vrh usnesen\u00ed Z&nbsp;M\u010c<\/a><\/li>\r\n<\/ul>","protected":false},"excerpt":{"rendered":"Usnesen\u00ed rady M\u010c Praha&nbsp;7 N\u00e1vrh k&nbsp;rozpo\u010dtu M\u010c Praha&nbsp;7 na rok 2014 &#8211; hlavn\u00ed \u010dinnost \u010d. 0055\/14 Ze dne 28.01.2014 Rada M\u010c P7 po projedn\u00e1n\u00ed Bere na v\u011bdom\u00ed p\u0159edlo\u017een\u00fd materi\u00e1l &#8211; n\u00e1vrh k&nbsp;rozpo\u010dtu M\u010c Praha&nbsp;7 na rok 2014 &#8211; hlavn\u00ed \u010dinnost Souhlas\u00ed s&nbsp;t\u00edm, \u017ee n\u00e1vrh rozpo\u010dtu M\u010c Praha&nbsp;7 na rok 2014 byl sestaven v&nbsp;n\u00e1vaznosti na [&hellip;]","protected":false},"author":17,"featured_media":0,"parent":8427,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/pages\/10609"}],"collection":[{"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/comments?post=10609"}],"version-history":[{"count":1,"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/pages\/10609\/revisions"}],"predecessor-version":[{"id":10626,"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/pages\/10609\/revisions\/10626"}],"up":[{"embeddable":true,"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/pages\/8427"}],"wp:attachment":[{"href":"https:\/\/www.praha7.cz\/api\/wp\/v2\/media?parent=10609"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}